Sr. No |
Name of Project |
Time Period |
Duration |
Client |
1 |
Topographical survey of NH-73 Yamunanagar to Panchkula |
2 Months |
2008-2009 |
Consulting Engineers Group Ltd |
2 |
Topographical survey of NH-4Hubli (Karnatka) |
1 Month |
2008-2009 |
Consulting Engineers Group Ltd |
3 |
Topographical survey & Demarcation Survey of Railway Line Mugal Sarai to Allahabad |
4 Months |
2008-2009 |
Rodic Consultant Pvt Ltd |
4 |
Building Demarcation in Kundli(HR) |
0.5 Months |
2008-2010 |
Ahluwaliya Contracts Ltd. |
5 |
Topographical survey of NH-73 Yamunanagar to Panchkula(Yamunanagar& Jagadhari By Pass) |
1 Month |
2009-2010 |
Consulting Engineers Group Ltd |
6 |
Detail survey & Check Survey of 400 KV Aravali(Jhajjar,HR) to Mundka(Delhi) Transmission Line |
3 Months |
2009-2010 |
Bajaj Electrical Ltd |
7 |
Topographical survey of NH-72B (KM 0 to 98) Paonta Sahib to Guma.Himachal Pardesh. |
2.5 Months |
2010-2011 |
Consulting Engineers Group Ltd |
8 |
Topographical survey of NH-113(KM 80 TO 180) |
2 Months |
2010-2011 |
Consulting Engineers Group Ltd |
9 |
Topographical survey of Railway Line Delhi to Panipat |
2 Months |
2010-2011 |
Consulting Engineers Group Ltd |
10 |
Topographical survey of Delhi Road |
5 Months |
2010-2011 |
DIMMTS LTD Kashmiri Gate |
11 |
Detail survey of 765 KV D/C Dharmjaygarh to Jabalpur Transmission Line(AP-153 TO 119 |
1.5 Months |
2010-2011 |
Escon Engineering Services. |
12 |
Topographical Survey of NH-23,32 |
2.5 Months |
2010-2011 |
Rodic Consultant Pvt Ltd |
13 |
Topographical Survey of NH-56 km 0.000 to 160.000 |
3 Months |
2010-2011 |
Sugam Technocrates Pvt. Ltd. |
14 |
Topographical survey of BRT Corridor ,Delhi |
1 Month |
2011-2012 |
Consulting Engineers Group Ltd |
15 |
Demarcation survey of ROW Pillar of NH-30 Mohnia to Ara Section km 70+000 to 116+760 in Bihar |
0.5 Months |
2011-2012 |
Consulting Engineers Group Ltd |
16 |
Topographical survey of road Hindoli-Jahajpur-Shahpur-Gulabpura in Rajasthan State. |
2 Months |
2011-2012 |
Consulting Engineers Group Ltd |
17 |
Topographical survey of Monorail Bangalore |
2 Months |
2011-2012 |
Consulting Engineers Group Ltd |
18 |
Topographical survey of Railway Line Delhi to Meerut |
1.5 Months |
2011-2012 |
Halcrow Consulting India Pvt. Ltd. |
19 |
Topographical Survey of NH-56 By Passes km 0.000 to 258.000 |
3 Months |
2011-2012 |
Sugam Technocrates Pvt. Ltd. |
20 |
Topographical survey of Bharatpur to Kosi KalanProposed Railway Line |
1 Month |
2011-2012 |
Theotech Project Services Pvt. Ltd. |
21 |
Topographical Survey of NH – 8 from Km. 177.000 to Km.260.100 in the State of Rajasthan |
2.5 Months |
2012-2013 |
Consulting Engineers Group Ltd |
22 |
Topographical Survey at Mangol puri & Udhyog Nagar Industrial Area in Delhi |
0.5 Month |
2012-2013 |
Theotech Project Services Pvt. Ltd. |
23 |
Topographical survey of NH-42 Angul to Sambalpur Orisa State. |
5 Months |
2012-2013 |
Voyants Solutions Private Ltd. |
24 |
Topographical survey of NH-758. |
2 Months |
2012-2013 |
Consulting Engineers Group Ltd |
25 |
Chindwara Ring Road Center Line, TBM Fixing, OGL, Traversing |
3 Months |
2012-2013 |
Sadbhav Engineers Ltd. |
26 |
Cross section of Kosi river for NH-106 Proposed bridge dist.Bhagalpur |
1 Month |
2012-2013 |
Consulting Engineers Group Ltd |
27 |
DGPS Survey of Green Field Expressway Delhi to Jaipur with Spur Line Bhiwadi and Jhajjar |
1 Month |
2013-2014 |
AECOM India Ltd. |
28 |
X - Section of Kotdwar to Srinagar NH- |
1 Month |
2013-2014 |
Lion Consultants |
29 |
Topographical Survey for rehabilitation and upgrade of NH-28C Barabanki- Bahraich (KM 0.000 to Km 43.000) |
1.5 Months |
2014-2015 |
ASC Ifratech Pvt. Ltd. Noida Uttra Pradesh |
30 |
Topographic survey of Agra to Firozabad (Village Gurha) (km -2.634 to 0.000 to 53.500) Access Controlled Expressway (Green Field) Project in the State of Uttar Pradesh at the rates as mentioned below |
1 Month |
2014-2015 |
Consulting Engineers Group Ltd |
31 |
Pre-Tender Topographical & Level Survey for Agra-Lucknow Expressway from Chainage 00.000 to 299.00+21 Km link road |
1 Month |
2014-2015 |
Gulba Topographical Survey, Nasik, Maharashtra |
32 |
DGPS Survey work for the work of aerial photography , in State of Bihar |
1 Month |
2014-2015 |
Gulba Topographical Survey, Nasik, Maharashtra |
33 |
Topographical surveys of Section of NH-222 from the Junction with NH- 211 to Manwath section in Maharastar to 2 lanes Paved Shoulder on EPC basis |
1 Month |
2014-2015 |
Gulba Topographical Survey, Nasik, Maharashtra |
34 |
Topographic Survey of Unnao to Lucknow Road project from Km 236/500 to 299/588 of the Agra Lucknow Expressway Project in the state of Uttar Pradesh |
2 Months |
2014-2015 |
Gulba Topographical Survey, Nasik, Maharashtra |
35 |
Topographical Survey and center line demarcation and cross section for Jodhpur - Barmer section of NH-112 in the state of Rajasthan total Length=86Km. |
2 Months |
2014-2015 |
M/S Feedback Infra Private Limited (FIPL) |
36 |
Topographical survey, design of alignment, generate L-section & cross section plan for construction and estimate Panchehri to Nimol Jammu & Kashmir |
2 Months |
2014-2015 |
Sanjeev Singh Construction co., Jammu |
37 |
DPR for rehabilitation & up gradation to 2 Lane from KM 0.0 (Rishikesh Dharasu) to Km144.00 (Dharasu) of NH-94, Uttar Pradesh, INDIA |
1 Month |
2014-2015 |
SMEC India Pvt. Ltd., Gurgaon |
38 |
Topographical Survey of DFCC Proposed Bridge on Son River and railway siding at Son Nagar |
1 Month |
2015-2016 |
M/S ATEPL/MGCPL JV |
39 |
Topographic Survey of Eastern Peripheral Expressway 22 km Kundli to Palwal. Pkg.IV |
2 Months |
2015-2016 |
ASC Ifratech Pvt. Ltd. Noida Uttra Pradesh |
40 |
Topographical Survey of Proposed ROB cum Flyover at Ranichak, Haldia Dock complex |
15 days |
2015-2016 |
ASC Ifratech Pvt. Ltd. Noida Uttra Pradesh |
41 |
Topographical Survey for Four Lanes with paved side shoulder of Tapa to Bathinda Section ofNH-64 (New NH No.-7) in the State of Punjab. |
1 Month |
2015-2016 |
Consulting Engineers Group Ltd |
42 |
Topographical Survey for detail design four laning of NH-22 Parvanoo to Solan in the State of Himachal |
1.5 Months |
2015-2016 |
Consulting Engineers Group Ltd |
43 |
Work order for Topographic Survey for District Roads in Telangana |
6 Months |
2015-2016 |
Design Aid, New Delhi |
44 |
Topographical survey of District roads and SH in the state of Telangana Length 200km, |
3 Months |
2015-2016 |
Design Aid, New Delhi |
45 |
Topographical survey of DFCC Lot No. 202C Mughal Sarai to Bhavpur Total 62km. |
2 Months |
2015-2016 |
Ech-El-Bee Consultants & Engineers |
46 |
Establishment of the GPS control/reference points by DGPS at Hissar-Dabwali road NH-10 in the State of Haryana |
15 days |
2015-2016 |
Gawar Construction Ltd. Hissar Haryana |
47 |
Topographical surveys for NH – 218 Gulbarga to Humanbad |
3 Months |
2015-2016 |
Gulba Topographical Survey, Nasik, Maharashtra |
48 |
Topographical survey of Proposed Industrial Area Near Aurngabad, Maharashtra |
1 Month |
2015-2016 |
Gulba Topographical Survey, Nasik, Maharashtra |
49 |
Pre-Tendering topographical survey of DFCC line Rewari-Dadari Khurja |
1 Month |
2015-2016 |
Gulba Topographical Survey, Nasik, Maharashtra |
50 |
Final location survey and topographical survey of Railway electrification Rewari-Rajkot DFCC line SSP, SP, ATS,TS. |
2 Months |
2015-2016 |
M/S Escon Engineering Services. Vikas Puri New Delhi |
51 |
Topographical Survey and center line demarcation and cross section for Amabla- Kaithal (km 46.500 to 95.360) section of NH-65 in the state of Haryana |
1.5 Months |
2015-2016 |
M/S Feedback Infra Private Limited (FIPL) |
52 |
Topographical Survey and center line demarcation of NH-233 in the State of Uttar Pradesh |
3 Months |
2015-2016 |
M/S Sheladia Associates,Inc Hyderabad |
53 |
Topographical Survey of Yadagiri Roads (100 Km) in the State of Telangana |
1 Month |
2015-2016 |
M/S Sheladia Associates,Inc Hyderabad |
54 |
Topographical Survey of Nalgonda District Roads in the State of Telangana |
1 Month |
2015-2016 |
M/S Sheladia Associates,Inc Hyderabad |
55 |
Topographic Survey of DFCC Package 301,302 Dadari- Khurja and Pilkhani to Ambala 131 km. |
1 Month |
2015-2016 |
PNC Infratech Limited |
56 |
Topographic Survey of NH-73 2 Lane to 4 Laning Road Project Yamuna nagar to Panchkula, 60km. |
2 Months |
2015-2016 |
Sadbhav Engineering Limited Gujrat, India |
57 |
Pre Tendering survey and cross section survey of NH-12 Madhya Pradesh |
15 days |
2015-2016 |
SAMARTH INFRAENGG Technocrats Pvt. Ltd |
58 |
Topographical surveys for 2 – Lanes at Bhutan Border to Bangladesh Border comprising of Jaigaon – Hasimara – Dhupguri section and Mainaguri – Changrabandha section including proposed Pasakha access road of AH 48 corridor in the State of West Bengal |
1 Month |
2015-2016 |
SAMARTH INFRRA ENGG Technocrats Pvt. Ltd |
59 |
Topographic Survey of Eastern Peripheral Expressway 46.5km Kundli to Meerut Road. Pkg. I,II |
2 Months |
2015-2016 |
SKES Jaipur, Rajasthan, India. |
60 |
Work order for Topographical Survey SH-Package 15 (H-l and H-V) in State of Rajasthan. |
2 Months |
2015-2016 |
Theotech Project Services Pvt. Ltd. |
61 |
Topographical surveys of NH-8E from km 139+915 to Km. 180+478 for detail design in the State of Gujarat . |
1.5 Months |
2016-2017 |
Almondz Global Infra-Consultants Ltd. Gandhinagar Gujarat |
62 |
Carrying out Detailed Topography Survey Service for Two/Four laning with paved shoulder of Govindpur (Rajgunj)-Chas- West Bengal Border section of NH-32 from Km.0.000 to Km. 56.889 in the state of Jharkhand |
2 Months |
2016-2017 |
Ashoka Buildcon Limited,Nasik Maharashtra |
63 |
Topographical Survey for detail design of four laning with Paved shoulders of Varanasi-Gorakhpur Section NH-29 in the State of Uttra Pradesh |
2 Months |
2016-2017 |
Consulting Engineers Group Ltd |
64 |
Topographical survey of Proposed Thapra Bridge Near Bhilwara Rajasthan |
10 days |
2016-2017 |
Consulting Engineers Group Ltd |
65 |
Topographical Survey for six lane green field Proposed udaipur bypass 23.88km in the State of Rajasthan |
1 Month |
2016-2017 |
Consulting Engineers Group Ltd |
66 |
DGPS survey of NH-11A Section Dausa-Lalsot-Kauthun in the state of Rajasthan km 83.450 |
7days |
2016-2017 |
Consulting Engineers Group Ltd |
67 |
Final location survey and topographical survey of Railway siding NTPC Vindhyanachal, Shakti nagar, Obra Dam, Khadiya, Lanco, Rihand |
1 Month |
2016-2017 |
Ech-El-Bee Consultants & Engineers |
68 |
Pre Tendering survey and cross section survey of NH8E |
10 days |
2016-2017 |
SAMARTH INFRAENGG Technocrats Pvt. Ltd |
69 |
Pre Tendering Cross Section Survey NH-42 (Angul-Sambalpur Section) in the state of Orissa |
20 days |
2016-2017 |
SAMARTH INFRAENGG Technocrats Pvt. Ltd |
70 |
Pre Tendering Cross Section survey of NH-79 and NH-79A (Length km 214.870 approx)in the State of Rajasthan. |
1 Month |
2016-2017 |
SAMARTH INFRAENGG Technocrats Pvt. Ltd |
71 |
Topographical surveys for proposed flyover at Marthandam Junction and from Parvathipuram Junction on NH-47 in the state of Tamil Nadu. |
15 days |
2016-2017 |
SAMARTH INFRAENGG Technocrats Pvt. Ltd |
72 |
Pre Tendering Cross Section Survey NH-6 km 360 to 510 in the state of Maharashtra |
20 days |
2016-2017 |
SAMARTH INFRAENGG Technocrats Pvt. Ltd |
73 |
Pre Tendering Cross Section survey of NH-8 Km 287+400 to 494.210 in the state of Rajasthan to Gujrat. |
1 Month |
2016-2017 |
SAMARTH INFRAENGG Technocrats Pvt. Ltd |
74 |
Topographical surveys of Four Laning of NH 209 from Pollachi at Km:123/550 to Coimbatore at Km 150/400 in the State of TamilNadu |
1 Month |
2016-2017 |
SAMARTH INFRAENGG Technocrats Pvt. Ltd |
75 |
Pre Tendering Cross Section survey of NH-2 Km 483+687 to 628+753 in the state of U.P |
20 days |
2016-2017 |
SAMARTH INFRAENGG Technocrats Pvt. Ltd |
76 |
Pre Tendering Cross Section survey of Six laning of Anandauram–Pendurthi-Anakapalli section of NH-5 (new NH-16) from Km 681.000 (Existing Km 681.000) to Km 731.780 in State of Tamilnadu.the |
15 days |
2016-2017 |
SAMARTH INFRAENGG Technocrats Pvt. Ltd |
77 |
Pre Tendering Cross Section survey of NH-4 in the state of Karnataka |
20 days |
2016-2017 |
SAMARTH INFRAENGG Technocrats Pvt. Ltd |
78 |
Topographical surveys of 2 Lane with paved shoulder configuration and strengthening of NH 106 from km 0+000 to 106+000 in the State of Bihar |
3 Months |
2016-2017 |
SAMARTH INFRAENGG Technocrats Pvt. Ltd |
79 |
Pre Tendering Cross Section survey of NH-275 in the state of Karnataka. |
1 Month |
2016-2017 |
SAMARTH INFRAENGG Technocrats Pvt. Ltd |
80 |
Topographical Survey NH-75 Ranchi to Orisa Border in the State of Jharkhand |
1 Month |
2016-2017 |
Theotech Project Services Pvt. Ltd. |
81 |
Topographical Survey state highway Akola to in the State of Maharashtra |
1 Month |
2016-2017 |
Theotech Project Services Pvt. Ltd. |
82 |
Topo Survey for “Four laning of Kodinar to Veraval section of NH-8E from Km 221.610 to Km 263.000 – Package VI |
1 Month |
2016-2017 |
Almondz Global Infra-Consultants Ltd. Gandhinagar Gujarat |
83 |
Topographical Survey of NH-79 Kishangarh-Udaipur-Ahmadabad Section 90-214 |
2 Month |
2016-2017 |
Consulting Engineers Group Ltd |
84 |
Topographical Survey of NH-87 Rampur-Kathgodam km 0+000 to 93+222 Uttrakhand, Uttar Pradesh |
2 Month |
2016-2017 |
Feedback Infra Private Limited |
85 |
Topographical surveys of Birpur-Bihpur section (km 0.000 to Km 106.000) of NH106 under phase I of NHIIP in the State of Bihar |
2 Month |
2016-2017 |
SAMARTH INFRAENGG Technocrats Pvt. Ltd |
86 |
Topographical survey of proposed bypass of Udaipur City |
1 Month |
2016-2017 |
Consulting Engineers Group Ltd |
87 |
Topographical survey of District and rural road Telangan |
3 Months |
2016-2017 |
Design Aid, New Delhi |
88 |
Topographical survey of NH-21 Kullu bypass km 242-272 |
1 Month |
2016-2017 |
NKC Projects Pvt Ltd Gurugram |
89 |
To carrying out Topographical surveys for “Detailed design work for Four Laning of Addahole Km 263+000 to Km 328+000 Section of NH-75 (Old NH No-45) Karnataka |
1.5 Month |
2016-2017 |
SAMARTH INFRAENGG Technocrats Pvt. Ltd |
90 |
Topographical Survey of Proposed bridge Extradosed in the state of Tripura |
10 Days |
2017-2018 |
ASC Ifratech Pvt. Ltd. Noida Uttra Pradesh |
91 |
Bathymetric survey of Karmnasa River and Budh nala for Proposed Thermal Power plant Buxar Bihar |
15 Days |
2017-2018 |
Rodic Consultant Pvt Ltd |
92 |
Cross section survey and Bathymetric survey of Sone river for Proposed Indrapuri Dam Bihar |
1 Month |
2017-2018 |
Rodic Consultant Pvt Ltd |
93 |
Topographical Survey of Basohli-Badharwah-Doda section for DPR preparation Jammu & Kashmir |
1.5 Month |
2017-2018 |
Rodic Consultant Pvt Ltd |
94 |
Topographical Survey For Proposed bridge at India-Nepal border on Mechi River Pani Tanki Siliguri West Bengal |
7 Days |
2017-2018 |
ASC Ifratech Pvt. Ltd. Noida Uttra Pradesh |
95 |
Topographical Survey For Four laning road Lalghati chowk to NH-12 Junction |
10 Days |
2017-2018 |
ASC Ifratech Pvt. Ltd. Noida Uttra Pradesh |
96 |
Topographical Survey of Four/Six laning Goharganj-Bhopal section NH-12 Km255+300 to 301+200 MP |
1 Month |
2017-2018 |
ASC Ifratech Pvt. Ltd. Noida Uttra Pradesh |
97 |
Topographical Survey of Four/Six laning RUB,ROB,VUP Location of NH-16 (Old NH-5) 470+415 to 580+700 AP |
1 Month |
2017-2018 |
SAMARTH INFRAENGG Technocrats Pvt. Ltd |
98 |
To carry out Topographic survey for Construction of NH-37 from Jorahat to Demow km 453-535 in the state of Assam. |
1.5 Month |
2017-2018 |
Professional Civil Infra Pvt Ltd |
99 |
To carry out Topographic survey for Construction of Bypass to Vizianagaram Town of NH-43 (New NH-26) from Km 537/6 to Km 552.000 (Raipur to Visakhapatnam Section) To 4 Lane of Andhra Pradesh |
1 Month |
2017-2018 |
Professional Civil Infra Pvt Ltd |
100 |
To carry out Topographic survey for Construction of NH-58 km 266-298 Uttrakhand |
1 Month |
2017-2018 |
ASC Ifratech Pvt. Ltd. Noida Uttra Pradesh |
101 |
Topographical Survey For Four laning road Abdulaganj to Itarsi NH-69 section km 2+800 to 8+300 and 20+700 to 63+000 Pkg-1 MP |
1.5 Month |
2017-2018 |
NKC Projects Pvt Ltd Gurugram |
102 |
Topographical Survey For ROB, RUB, VUP Construction Jhajjar-Rewari Section Four location NH-71 |
10 Days |
2017-2018 |
Professional Civil Infra Pvt Ltd |
103 |
Topographical Survey of NH-75/76 Jhansi-Khujraho-section km 0+000 to 76+300 MP |
1.5 Month |
2017-2018 |
Consulting Engineers Group Ltd |
104 |
Topographical surveys for four laning Waranga phata to Mahagaon NH-361 |
1.5 Month |
2017-2018 |
Almondz Global Infra-Consultants Ltd. Gandhinagar Gujarat |
105 |
Topographical surveys of NH-365 Nakrekal-to Tanamcherla km 0+00 to 72+600 Telangana |
1.5 Month |
2017-2018 |
Ruku Projects Pvt Ltd Hyderabad |
106 |
DGPS Survey, Traversing and enter line demarcation of SH-42 Garautha-Chirgaon Km 118+600 to 167+500 MP |
15 Days |
2017-2018 |
NKC Projects Pvt Ltd Gurugram |
107 |
ROW stone fixing and taking cross section of Udaipur bypass |
1 Month |
2017-2018 |
Sadbhav Engineering Limited Gujrat, India |
108 |
DGPS Survey Saharanpur-Yamunanagar NH-73 |
4 Days |
2017-2018 |
Gawar Construction Ltd. Hissar Haryana |
109 |
Topographical survey of Ganga River bridge and Bathymetric survey Bhagalpur Bihar |
15 days |
2017-2018 |
Rodic Consultant Pvt Ltd |
110 |
Topographical survey of Jaipur City Road Survey Rajasthan |
10 days |
2017-2018 |
Almondz Global Infra-Consultants Ltd. Gandhinagar Gujarat |
111 |
Topographical survey of Jaipur Ring Road Survey Rajasthan km 0+300 to 46+700 |
15 days |
2017-2018 |
Gawar Construction Ltd. Hissar Haryana |
112 |
Topographical survey of Kalwakurthi-Mallepally km 67+00 to 114+200 Telangana |
1 Month |
2017-2018 |
Design Aid, New Delhi |
113 |
To carrying out Topographical surveys for “ Six laning of Ranastalam - Anandpuram section of NH-16 from Km 634.000 to Km 681.000 in the State of Andhra Pradesh |
1 Month |
2017-2018 |
SAMARTH INFRAENGG Technocrats Pvt. Ltd |
114 |
To carrying out Topographical surveys for “ Rehabilitation and Up gradation of Narsatpur to Barasgaon Section of NH- 222 km 514-558 Maharashtra |
1 Month |
2017-2018 |
SAMARTH INFRAENGG Technocrats Pvt. Ltd |
115 |
Topographical survey of SH-13 Ajeetgarh-Chala Rajasthan |
1 Month |
2017-2018 |
Satish Kumar Contractor |
116 |
Topographical survey of MDR-92 Singhana-Satnali 0+000 to 34+000 Rajasrhan |
1 Month |
2017-2018 |
Himalayan Infrcorp. Pvt Ltd |
117 |
Pre Bid Survey NH-206, NH-65 Jodhpur bypass, NH-2 Aurngabad, NH-965, NH-66, NH-166, NH-200, NH-206, NH-211, NH-275, Mumbai-Vadodara Greenfield expressway,Kagal -Satara |
4 Months |
2017-2018 |
SAMARTH INFRAENGG Technocrats Pvt. Ltd |
118 |
Pre Tendering Cross Section survey of NH-5 Odisha |
15 Days |
2017-2018 |
ASC Ifratech Pvt. Ltd. Noida Uttra Pradesh |
119 |
Pre Tendering Cross Section survey of Ahmednagar Bypass Maharashtra |
12 Days |
2017-2018 |
Ashoka Buildcon Limited,Nasik Maharashtra |
120 |
Pre Tendering Cross Section survey of Bombay-Nagpur Expressway Pkg-7,8 Maharashtra |
7 Days |
2017-2018 |
Consulting Engineers Group Ltd |
121 |
Topographical survey for detail design NH-13 Solapur-Bizapur Maharashtra |
3 Months |
2018-2019 |
Spera Infra Consultants Pvt Ltd, Hyderabad |
122 |
Topographical survey for detail design NH-112 Cuttack-Angul Odisha |
2 Months |
2018-2019 |
Spera Infra Consultants Pvt Ltd |
123 |
Topographical survey of NH-137A Imphal to Kakching Manipur |
1 Month |
2018-2019 |
Rodic Consultant Pvt Ltd, New Delhi |
124 |
Topographical survey for Details design NH-5 Chennai-Tada Tamilnadu |
1 Month |
2018-2019 |
SPL Infrastructure Pvt Ltd, Tamilnadu |
125 |
Topographical survey for Details design NH-3 Nashik-Gonde for VUP, ROB Maharshtra |
1 Month |
2018-2019 |
ASC Ifratech Pvt. Ltd. Noida Uttra Pradesh |
126 |
Topographical survey for Details design NH-65 Jodhpur Ring Road Rajasthan |
2 Months |
2018-2019 |
Almondz Global Infra-Consultants Ltd. Gandhinagar Gujarat |
127 |
Topographical survey for Details design NH-215 Remuili to Kioda Odisha |
1 Month |
2018-2019 |
Consulting Engineers Group Ltd |
128 |
Pre Tendering Cross Section survey of NH-7 Kgal-Satara Maharashtra |
15 Days |
2018-2019 |
SAMARTH INFRAENGG Technocrats Pvt. Ltd |
129 |
Topographical survey for Details design NH-2 from Km.360.300 to Km. 400.132Jharkhand |
1 Month |
2018-2019 |
SAMARTH INFRAENGG Technocrats Pvt. Ltd |
130 |
Topographical survey for Details design NH-206 from km 12+310 tp 170+415 Karnataka |
3 Months |
2018-2019 |
SAMARTH INFRAENGG Technocrats Pvt. Ltd |
131 |
Topographical survey for Details design NH-140 from Chittor-Tirupati Andra Pradesh |
2 Months |
2018-2019 |
Ruku Projects Pvt Ltd Hyderabad |
132 |
Topographical survey for Details design NH-161 Ramsanpally to Mangloor Telangana |
1 Month |
2018-2019 |
Ruku Projects Pvt Ltd Hyderabad |
133 |
Topographical survey for Details design NH-16,NH-5and NH8A for VUP,ROB,RUB Tamilnadu, Gujarat |
3 Months |
2018-2019 |
SAMARTH INFRAENGG Technocrats Pvt. Ltd |
134 |
Topographical survey for Details design NH-2 Allahabad-Chakeri UP |
2 Months |
2018-2019 |
Consulting Engineers Group Ltd |
135 |
Topographical survey for Details design Dwarka Expressway Airport New Delhi |
1 Month |
2018-2019 |
Consulting Engineers Group Ltd |
136 |
Topographical survey of distillery plant area in the State of Punjab |
7 Days |
2018-2019 |
Premier Alcobev Private Limited |
137 |
Topographical Survey of MDR road Shamshabad-Nagarguda Telangana |
1 Month |
2018-2019 |
Design Aid, New Delhi |
138 |
Topographical survey for Details design NH-39 Imphal to Kkaching Section Manipur |
1 Month |
2018-2019 |
Ruku Projects Pvt Ltd Hyderabad |
139 |
Topographical Survey four laning of kanujurmarg to Badalapur in the state of Maharashtra on EPCmode |
1 Month |
2019-2020 |
Sieat Engineering PVt Ltd |
140 |
Topographical Survey of 6 lane of rasisar-deogarh section NH-754k as a part of Amritsar -Jam nagar in the state of Rajashtan on EPC under Bhartmala pariyojna PKG-1 |
1 Month |
2019-2020 |
NKC Project Pvt Ltd |
141 |
Topographical Survey Delhi -Vadodara Greenfiled Alignment (NH-148N)under Bharta Mala Pariyojana in the State of Madhya Pradesh on EPC mode. |
1 Month |
2019-2020 |
Aartav Engineering |
142 |
Topographical Survey 4/6 lane configuration from Muragacha to Kampa in West Bengal to be Executed through EPC mode. |
1 Month |
2019-2020 |
DRA Infracon Pvt.Ltd. |
143 |
Ground Control and Hydrographic Crooss Section Survey new single BG line from Khagaris to Kuseshwar Asthan in Bihar |
1 Month |
2019-2020 |
MATRIX GEO SOUTIONS PVT LTD |
144 |
Topographical survey of Sharavati Bridge near Honnavar Village, Karnataka. |
1 Month |
2019-2020 |
Rodic Consultants Pvt. Ltd |
145 |
DGPS Survey for Centrally Protected Monuments /Sites covering protected ,Prohiblted and Regulated areas in Mumbai in the state of Maharashtra |
1 Month |
2019-2020 |
Geokno India Private Limited |
146 |
Topographical survey for water Supply Scheme in Agra |
1 Month |
2019-2020 |
Sadhan Engineers Pvt.Ltd |
147 |
Topographical survey for “Bundelkhand Expressway Projects(Package III) from Kaohari (Dist. Mahoba) to Baroli Kharka (Dist. Hamirpur) in the state of Uttar Pradesh”. |
2 Month |
2019-2020 |
SAMARTH INFRAENGG Technocrats Pvt. Ltd |
148 |
Topographical survey Gangheri to Narnaul Greenfield Expressway. |
1 Month |
2019-2020 |
AECOM. |
149 |
Ground Control Survey new single along Karong Besho-Tobufl-Kidima-Chakabama Road in Nagaland /Manipur |
1 Month |
2019-2020 |
MATRIX GEO SOUTIONS PVT LTD |
150 |
Cross Section Survey from Mokkochung to Tuli of section of NH-61 in the state of Nagaland. |
1 Month |
2019-2020 |
RUKY Projects Pvt. Ltd. |
151 |
Marking of PROW and PCL for landacquisition work in J&K for DPRs project including muck disposal area marking (i) Sudhmahadev tunnel, ii Goha –Khellani Road and (iii) Vailoo Tunnel |
1 Month |
2019-2020 |
Rodic Consultants Pvt. Ltd. |
152 |
Topographical Survey for Aligarh – Kanpur section from Km. 289+000(design Ch. 302+108) to Km356+000 (design Ch. 373+085) (Pkg. 4 from Naviganj –Mitrasen) of NH-91 in the State of Uttar Pradesh. |
1 Month |
2019-2020 |
G R Infra Projects Ltd. |
153 |
Ground Control and Hydrographic Cross Section Using DGPS,Auto Level and Echo Sounder in the river Brahmaputra on the post monsoon 2019river configuration for area around the Bogibeel bridge location near Dibrugarh inAssam “. |
1 Month |
2019-2020 |
MATRIX GEO SOUTIONS PVT LTD |
154 |
Topographic survey for Construction of NH-37 from Jorahat to Demow in the state of Assam. |
1 Month |
2019-2020 |
Professional Civil Infra Pvt. Ltd. |
155 |
Topographical surveys for “Four Lning of Jittandahalli – Dharmapuri section of new NH-844 from Km. 60+100 to Km. 94+460 in the state of Tamil Nadu”. |
2 Month |
2019-2020 |
SAMARTH INFRAENGG Technocrats Pvt. Ltd |
156 |
Drone & LIDAR Survey of Akashardham Pkg. 1&2 and Dwarka Pkg. 1&2 in the State of Delhi |
1 Month |
2019-2020 |
LARSEN AND TOUBRO LIMITED |
157 |
Topographical Survey for four laning of Unnao Lalganj section of NH-232A in the state of Uttar Pradesh |
1 Month |
2019-2020 |
CConsulting Engineers Group Ltd |
158 |
Total Station Survey at Delhi Zone – North West. (250 KM) |
1 Month |
2019-2020 |
Sadhan Engineers Pvt.Ltd |
159 |
Work order for “Detailed Engineering Services for Six-Laning of Amritsar - Jamnagar Package-4 (Km: 72+000 to 97+000), Package-6 (Km: 125+000 to 150+000) & Package-7 (Km: 150+000 to 180+000) on EPC mode in the State of Rajasthan- Work Order-Reg. |
1 Month |
2020-2021 |
SPERA INFRA CONSULTANTS PVT LTD |
160 |
Work order for Topographical Survey for Four Ianing of Unnao Lalganj section of NH-232A from km -0.550 (Design Ch 0.000, Unnao) to km 65+173 (Design Ch 70.000, Lalganj), Design length 70.000 km in the state of Uttar Pradesh under Bharatmala Pariyojana on Hybrid Annuity Mode. |
1 Month |
2020-2021 |
CONSULTING ENGINEERS GROUP LTD |
161 |
Rehabilitation & Upgradation of Road from design km 0 to 25.250 of Kailashar- Kurti Bridge section on NH-208A to two lane with Paved shoulder in the state of Tripura on EPC mode (Package 1 & II) |
1 Month |
2020-2021 |
ASC INFRATECH PVT LTD |
162 |
Drone & GNSS Survey Vadodara Mumbai Exp |
1 Month |
2020-2021 |
LARSEN AND TOUBRO LIMITED L&T NXT |
163 |
Khagaria Project DGPS and Auto Levelling for 250km |
1 Month |
2020-2021 |
MATRIX GEO SOUTIONS PVT LTD |
164 |
Purchase order for “Ground Control Survey using DGPS & RTK for Proposed 3rd and 4th line between Varanasi-Mughalsarai section on Lucknow Division of Northern Railway in the state of Uttar Pradesh”. Against Quotation received over mail- dated July 04, 2020. |
1 Month |
2020-2021 |
MATRIX GEO SOUTIONS PVT LTD |
165 |
Work order for carrying out Topographical surveys for “Four Lning of Jittandahalli – Dharmapuri section of new NH-844 from Km. 60+100 to Km. 94+460 in the state of Tamil Nadu”. |
1 Month |
2020-2021 |
SAMARTH INFRAENGG Technocrafts Pvt Ltd |
166 |
Rehabilitation and Up-gradation to 2-lane with paved shoulders of Seling- Dulte section (Economic Corridor) ofNH-6 from Existing chainage Km 50+360 to Km 69+015 (Design Cbainage 45+040 to Km 62+200) in the state of Mizoram under Bharatmala Pariyojana on EPC Mode - Work Order - Sub Consultancy Services for Conducting Topographical Survey - Reg |
1 Month |
2020-2021 |
RUKY Projects Private Limited |
167 |
Drone & LiDAR Survey Delhi |
1 Month |
2020-2021 |
LARSEN AND TOUBRO LIMITED L&T NXT |
168 |
Work Order for Topographical Survey Four Ianing of Meerut- Nazibabad section from Km 11+500 (Design Chainage 11.500 Meerut) to Km 39+240 (Design Cbainage 39.250 Behsuma) and from Km 86+590 (Design Chainages 79.500 Bijnor) to Km 112+545 (Design Chainage 105.700 Jalala bad) (Design Length = 53.950 Km) of NH-119 (New NH-34) in the state of Uttar Pradesh under Bharatmala Pariyojana on HAM |
1 Month |
2020-2021 |
CONSULTING ENGINEERS GROUP LTD |
169 |
Providing Consultancy Services for Topographical Survey of Construction of Eight Lane Carriageway starting near Major Bridge on Mej River to Junction with Slf-37A (Cb. 331.030 - 359.170) section of Delhi - Vadodara Access Controlled Green field AJignment (NR-148N) on EPC Mode under Bha ratmala Pariyojana in the State of Rajasthan. |
1 Month |
2020-2021 |
GR INFRAPROJECTS LTD |
170 |
Topographical Survey of four lane proposed road Paonta Sahib to Dehradun. |
1 Month |
2020-2021 |
SUGAM TECHNOCRAFTS PRIVATE LIMITED |
171 |
Carrying out for Pre bid Cross Section Survey of “Four lane highway comprises of the section of National Highway No 347BG & 753L from Dhangaon (Design Chainage 81.00/ Existing Chainage 86.00) and end Borgaon (Design Chainage 139.000/ Existing Chainage 143.00) (Design Length = 58.00 Km) in the state of Madhya Pradesh ”. |
1 Month |
2020-2021 |
SAMARTH INFRAENGG Technocrafts Pvt Ltd |
172 |
Work order for “Detailed Engineering Services for Four-Laning of Thorapalli Agraharam - Jittandahalli section of NH-844 from Km.23+350 to Km.60+100 (Design Chainage) under Bharatmala Pariyojana, Phase I (National Corridor) on Hybrid Annuity Mode in the state of Tamilnadu” |
1 Month |
2020-2021 |
SPERA INFRA CONSULTANTS PVT LTD |
173 |
Topographical Survey for four Ianing of Banihal Bypass km 187+000 to 189+350 in the state of Jammu & Kashmir on EPC Mode. |
1 Month |
2020-2021 |
MG Contractors Pvt Ltd |
174 |
Construction of fou r lane expressway from start of DSlR Zone of Ahmedabad district to Adhelai village of Bhavnagar district (Ch. 71.00 to Ch. 109.019) section of Ahmedabad - Dholera Greenfield alignment (NH-751) under Bharatmala Priyojana in the state of Gujarat (Package-IV) on EPC Mode. |
1 Month |
2020-2021 |
MKC Infrastucture Ltd. |
175 |
Purchase order for "Ground Control Survey using DGPS Static, RTK and Leveling for Jhansi to Babino Section of Northern Railway in the state of Uttar Pradesh". |
1 Month |
2020-2021 |
MATRIX GEO SOUTIONS PVT LTD |
176 |
Carrying out Topographical surveys for “Four Lning of Arrah-Mohnia (NH-30) in the state of Bihar”. |
1 Month |
2020-2021 |
SAMARTH INFRAENGG Technocrafts Pvt Ltd |
177 |
Construction of Six Lane access controlled Highway from Junction with JaitpurPushta Road to Junction with Sector-62/65 dividing road on Faridabad – Ballabhgarh Bypass Section of NH-148NA (Design Ch. 9+000 to 33+000) including spur from Design Ch. 13+200 to Junction of Faridabad-Ballabhgarh Bypass with NH-19 near Badarpur Border in the state of Haryana under Bharatmala Pariyojana on Hybrid Annuity Model - Work order for Topographic Survey |
1 Month |
2020-2021 |
Dineshchandra R. Agrawal Infracon Pvt Ltd |
178 |
Rehabilitation and Upgrading the Section of SH-53 from Mundur Junction (Km.12/800) to Thootha Junction (Km.49/600) to divided carriageway (36.80 Km) in Palakkad District under Rebuild Kerala Initiative (RKI).” – Work Order for Topographic Survey |
1 Month |
2020-2021 |
Professional Civil Infra Pvt Ltd |
179 |
Rehabilitation and Upgrading the road Perambilavu to Nilambur section of SH-39 from Km.30/700 to Km.62/480 (Length of 30.88 Kms excluding Km.35/975 to 36/425 and Km.58/500 to 58/950) in Mallapuram District under Rebuild Kerala Initiative (RKI).” – Work Order for Topographic Survey |
1 Month |
2020-2021 |
Professional Civil Infra Pvt Ltd |
180 |
Work order for "Rehabilitation and Upgradation to 2-lane with paved shoulders configuration of Paderu to Gondiguda section (Km 2+400 to Km 27+480 ) of NH-516E in the State of Andhra Pradesh under Green National Highways Corridor Project (GNHCP) with the loan assistance of World Bank on EPC mode."
|
1 Month |
2020-2021 |
SPERA INFRA CONSULTANTS PVT LTD |
181 |
Ground Control Survey using DGPS & RTK for Proposed
Doubling between Mudkhed to Medchal Stations (235 km) |
1 Month |
2020-2021 |
MATRIX GEO SOUTIONS PVT LTD |
182 |
Ground Control Survey using DGPS & RTK for Proposed
Doubling between Mahbubnagar to Dhone Stations (183 km) |
1 Month |
2020-2021 |
MATRIX GEO SOUTIONS PVT LTD |
183 |
Ground Control Survey using DGPS & RTK for Proposed Doubling between Guntur- BibiNagar Stations (248 km) |
1 Month |
2020-2021 |
MATRIX GEO SOUTIONS PVT LTD |
184 |
DGPS Survey for Kosi Bridge, Patna-30Km |
1 Month |
2020-2021 |
LARSEN AND TOUBRO LIMITED L&T NXT |
185 |
"lmprovement I Up-gradation of existing 2-Lane Road to 4-Lane Divided Highway from Taphukuki to Daili Section (Pkg-4A) of Imphal Kohima Road (NH-39) (Design Chainage from Km 262+175 to Km 274+610) in the State of Manipur on EPC Mode"
"lmprovement I Up-gradation of existing 2-Lane Road to 4-Lane Divided Highway from Daili to Kuraopokpi section (Pkg-48) of Imphal Kohima Road (NH-39) (Design Chainage from Km 274+610 to Km 287+000) in the State of Manipur on EPC Mode" -Work Order for Design Consultancy Services-Reg. |
1 Month |
2020-2021 |
SPERA INFRA CONSULTANTS PVT LTD |
186 |
Carrying out for Pre bid Cross Section Survey of “Four Lane Bangalore Chennai Expressway from Ch. 127.000 to Ch. 156.000 (Bangarupalem to Gudipala Section in the state of Andhra Pradesh) under Bharatmala pariyojna on hybrid Annuity mode”. |
1 Month |
2020-2021 |
SAMARTH INFRAENGG Technocrafts Pvt Ltd |
187 |
Four/Six Laning of Bodhre to Dhule section from km 390.000 to km 457.231(Design Chainage) of NH-211 (New NH-52) (Design Length # 67.231 km) in the State of Maharashtra under Bharatmala Pariyojana on Hybrid Annuity Mode. |
1 Month |
2020-2021 |
Ashoka Buildcon Limited |
188 |
Ground Control Survey using DGPS & RTK for Proposed Doubling between Hosur to Omalur Stations. |
1 Month |
2020-2021 |
MATRIX GEO SOUTIONS PVT LTD |
189 |
Ground Control Survey using DGPS & RTK for Proposed Doubling between Muri-Barkakhana Stations (59.2 Km) project of Ranchi Division. |
1 Month |
2020-2021 |
MATRIX GEO SOUTIONS PVT LTD |
190 |
Ground Control Survey using DGPS Static survey for works associated with Railway Electrification of Northeast Frontier Railway (NFR). |
1 Month |
2020-2021 |
MATRIX GEO SOUTIONS PVT LTD |
191 |
Consultancy Services for PREPARATION OF Detailed project Report for widening and strengthening of PR road from Gajwel – Venkatraopet Road to Dacharam PR road via Kysaram SC colony from Km 0/0 to Km 5/3 to Siddipet District (Total 5.3 km) and widening and strengthening to four lane in Km 26/8 to 32/9 on Sirisilla – Siddipet Road in Siddipet District ( Total Km 6.10 ). |
1 Month |
2020-2021 |
SHELADIA Associates Inc |
192 |
Static points and Levelling Survey using DGPS and Digital Level for Asthalbohar to Rewari Section of Northern Railway in the state of Haryana. |
1 Month |
2020-2021 |
MATRIX GEO SOUTIONS PVT LTD |
193 |
Static and RTK Points Survey using DGPS for Dalmia, Murli Mines ,Kalyanpur in the state of Bihar. |
1 Month |
2020-2021 |
MATRIX GEO SOUTIONS PVT LTD |
194 |
Detailed Design Services for the work of Strengthening of the Project Highway comprises the section of [National Highway 53 Section of Raipur Durg Road commencing from km 281.000 to km 307.600 i.e. the 26.600 kms section in the State of Chhatishgarh. |
1 Month |
2020-2021 |
GAHAN INFRA CONSULTANT |
195 |
Topograhical Survey Work Order for “Construction of 3 Lane western side flyover from design Km 0.300[existing Km 1098.680 (Before Jyothi Mahal Junction) to design Km 2.770 [existing Km 1096.210 (Beyond Ramesh Hospital Junction) on NH-16 in the state of Andhra Pradesh on EPC mode.” |
1 Month |
2020-2021 |
SPERA INFRA CONSULTANTS PVT LTD |
196 |
Ground Control Survey using DGPS & RTK along DMRC line-S (lnderlok to Brig. Hoshiyar Singh Metro Station) & line-6 ( Kashmere Gate to Badarpur Metro Station) having 28 km and 15 Km stretch respectively |
1 Month |
2020-2021 |
MATRIX GEO SOUTIONS PVT LTD |
197 |
Ground ControlSurvey using DGPS,RTK and Hydrographic survey for Barinium Hydro electric project in District Kishtwar of Jammu and Kashmir. |
1 Month |
2020-2021 |
MATRIX GEO SOUTIONS PVT LTD |
198 |
DGPS and Hydrographic cross section survey brahmaputra for area around the bogibeel bridge location near dibrugarh in the State of Assam |
1 Month |
2020-2021 |
MATRIX GEO SOUTIONS PVT LTD |
199 |
DGPS Survey of PKG-6 Mahsr |
1 Month |
2020-2021 |
L &T |
200 |
Topographical Surveys for " Thuraiyur -Perambalur Road (SH-142) From KM 2/0-13/120,KM 14/640-27/800 and KM 29/820 -32/0 to two lane paved shoulders and Consruction of two bypass to Nakkasalem and kurumbalur to a length of 3.54 KM from 13/120 -14/640 & KM 27/800-29/820 in the state of Tamil Nadu |
1 Month |
2020-2021 |
SAMARTH INFRAENGG Technocrafts Pvt Ltd |
201 |
Topographical Survey with Drone for two sections Pangare to Warange Phata Section from km 134.500 to km 174.645 of NH-161(40KM) in Maharashtra and Bangalore to Malur Section of Bangalore Chennai Expressway 27 Km in Karnataka. |
1 Month |
2020-2021 |
AECOM India Private Ltd. |
202 |
Carring Out topographical Survey and spot Level @10-10 Grid Talwara Punjab |
1 Month |
2020-2021 |
Premier Alcobev Private Limited |
203 |
Gauge Conversion of Bechraji (63.83 KM) Ranuj(1013983 KM) Sectin Total Length of 38.153 KM Metre Gauge to broad Gauge with 25 KV AC Electrification in Ahmedabad Division of Westren Railway |
1 Month |
2020-2021 |
Ashoka Bulidcon Limited |
204 |
Gurugram Metropolitan Development Authority & Roshni Builders Pvt. Ltd. (the "Contract") whereby AECOM will provide professional services in respect of The topographical survey by using Aerial Drone, LiDAR, Auto level & Total station for Southern Peripheral Road Gurugram. |
1 Month |
2020-2021 |
AECOM India Private Ltd. |
205 |
Static points and RTK points Survey using DGPS for Lucknow yard |
1 Month |
2020-2021 |
MATRIX GEO SOUTIONS PVT LTD |
206 |
Static points Survey using DGPS for waste management Kanpur |
1 Month |
2020-2021 |
MATRIX GEO SOUTIONS PVT LTD |
207 |
Topographical Work for Two Topographical Work order for “Two Laning with Paved Shoulder of Meensurutti (Km. 98.433) to Chidambaram (Km. 129.965) Section of NH-227 on Hybrid Annuity Mode under Bharatmala Pariyojana Phase – I (Residual Projects under NHDP) in the State of Tamilnadu” |
1 Month |
2020-2021 |
SPERA INFRA CONSULTANTS PVT LTD |
208 |
survey work for monitoring of Slope protection of Posonallah Guide bund works as per cross section prepared by design consultant in respect of the Projects |
1 Month |
2020-2021 |
Dibang Infra Projects Limited |
209 |
Punjab Bhartmala Project -Phagwara to Hoshiyar Singh to (40 KM) Yamuna Nagar to Bilaspur (13 KM) & Hasi (4 Km) in the State of Punjab & Haryana |
1 Month |
2020-2021 |
MATRIX GEO SOUTIONS PVT LTD |
210 |
RTK points Survey using DGPS for POC-Odisha |
1 Month |
2020-2021 |
MATRIX GEO SOUTIONS PVT LTD |
211 |
Static points Pillar casting & RTK points survey using DGPS for Sikarpai to Randikena Odisha |
1 Month |
2020-2021 |
MATRIX GEO SOUTIONS PVT LTD |
212 |
Topographical Survey on the following works:
4 Laning of Pangare to Warangaphata from Km 134.500 to Km 174.645 (Design Chainage) of NH-161 including bypasses at Kalamnuri, Akhada Balapur and additional length of 800m from Waranga jn to nanded (NH-161) and additional 700m road from Waranga Jn (NH-161) to Mahagaon (NH-361) in the State of Maharashtra on EPC mode. |
1 Month |
2020-2021 |
Rajendra Singh Bhamboo Infra Pvt. Ltd |
213 |
Topographical Survey for Construction of four lane Greenfield Delhi-Amritsar-Katra Expressway from junction with Jind-Karnal road (NH-709A) near Alewa village to junction with Ambala-Kaithal-Hissar road (NH-152)near Kharak Pandwa village (KM 91 +400 to KM 120 +250) on Hybrid Annuity Mode under Bharatmala Pariyojna in the state of Haryana. |
1 Month |
2020-2021 |
NKC Projects Pvt. |
214 |
Four Laning of Jorahat – Shillong (Barapani) Section of NH-40 from Km. 0.000 to Km. 61.800 in the State of Assam. |
15 Days |
2020-2021 |
Sekura Road Limited |
215 |
for ROW Pillar fixing on four lane proposed road Paonta Sahib to Dehradun |
1 Month |
2020-2021 |
Sugam Technocrats Pvt Ltd |
216 |
Topographic survey of our Project Widening /Improvement to 4(Four) lane with paved shoulder from CH.
52.470 km to CH. 71.500 km (Designed CH. 48.655 km to CH. 67.556 km of Tulungia-Jogighopa Bridge Approach Section (Package-5) of Bilasipura-Guwahati Road (NH-17) in state of Assam on EPC mode,
|
1 Month |
2020-2021 |
Sachin Infra |
217 |
Topographical Survey for four Laning of Munger to Mirzachuki Section of NH-80 PKG-1 (KM 69+520 to KM 95+580) Hybrid Anniuty Project |
1 Month |
2020-2021 |
CEG |
218 |
Ground Control Survey using DGPS & RTK at Prayragraj jn karchana ,Jigna,Mandah and Bheerpur Yard in the state of Uttar Pardesh |
1 Month |
2020-2021 |
MATRIX GEO SOUTIONS PVT LTD |
219 |
Construction of Four Lane ring raod/Bypass around Srinagar City from KM 0.000 to KM 42.100(Phase-1) under NHDP Phase VII in the Union territory of Jammu and Kashmir under Bharatmala Pariyojna |
1 Month |
2020-2021 |
NKC Projects Pvt. |
220 |
Topographical Survey for Development of Six Lane Hatibena -Badakumari Section of NH-130-CD road from KM 124+611 to KM 146+500 under Raipur-Visakhapatnam Economics Corridor in the state of Odisha on Hybrid Annuity Mode(PKG-OD-1). |
1 Month |
2020-2021 |
NKC Projects Pvt. |
221 |
Topographical Survey for Development of Six Lane Karki-Kaliagura Section of NH-130-CD road from KM 226 +500 to KM 249+000 under Raipur-Visakhapatnam Economics Corridor in the state of Odisha on Hybrid Annuity Mode(PKG-OD-4). |
1 Month |
2020-2021 |
NKC Projects Pvt. |
222 |
Topographical Work order for “Four Laning of Mamallapuram to Mugaiyur Section of NH - 332A from Km.0.000 to Km. 31.000 (design chainage) under Bharatmala Pariyojana Phase -1 (feeder routes) on HAM mode in the state of Tamil Nadu” |
1 Month |
2020-2021 |
SPERA INFRA CONSULTANTS PVT LTD |
223 |
Topographical Survey for Development of Six Lane Korlam-Kantakapalle Section of NH-130-CD road from KM 445 +100 to KM 464+662 under Raipur-Visakhapatnam Economics Corridor in the state of Andhra Pradesh on Hybrid Annuity Mode(PKG-4). |
1 Month |
2020-2021 |
NKC Projects Pvt. |
224 |
Topographical Survey Four -lane greenfiled Delhi-Amritsar -Katra Expressway from Jussur Kheri on KMP Expressway to Junction with Rohtak -Panipat road (NH-709) Near Rukhi Panni Village (0+00to 34+00 KM )on Hybrid annuity mode under bhartmala pariyojna in the state of haryana |
1 Month |
2020-2021 |
KCC Bulidcon Pvt. Ltd |
225 |
Construction of Eight Lane Access Controlled Expressway From KM 3.000 to KM 69.800 (Shirsad -SPUR of Vadodara -Mumbai Expressway ) in the State of Maharashtra on Hybride Annuity mode under Bhartmala Pariyojna (PKG-XIV,XV,XVI) |
2 Months |
2021-2022 |
Ashoka Buildcon Limited |
226 |
Carring Out Prebid Cross Section Survey of Dholera airport in the state of Gujrat |
1 Month |
2021-2022 |
SAMARTH INFRAENGG Technocrafts Pvt Ltd |
227 |
Topographical survey of Four-laning of Bangalore-Mangalore Section from km 270+270 (Periya Shanthi) to km 318+755 (Bantwal) including 6-lane Flyover at Kalladka Town in km. 311 – km. 314 on NH-75 on EPC Basis in Karnataka. |
90 Days |
2021-2022 |
KNR Constructions Pvt.Ltd |
228 |
Conducting Static Point and RTK Using DGPS in Guwahati in the State of Assam |
1 Month |
2021-2022 |
MATRIX GEO SOUTIONS PVT LTD |
229 |
All India Institute of Medical Science Master Planing and Program Management Consultants Services for Redevelopment of AIIMS Camps New Delhi |
1 Month |
2021-2022 |
AECOM India Private Ltd. |
230 |
EPC for provision of 3rd & 4th Line betwwwn Barabanki (Excluding)-Malhaur (excluding) including electrification and signalling & Telecommunication works in section commencing from KM 1068.900 to 1082.400 i.e. 13.500 KM in the State or Utar Pardesh |
1 Month |
2021-2022 |
Ashoka Buildcon Limited |
231 |
EPC for doubling of Railway track between Ludhiana and Kila Raipur (17.174 KM) of Northen Railway including electrification and signalling & Telecommuncation work |
1 Month |
2021-2022 |
Ashoka Buildcon Limited |
232 |
Static points ,RTK points Survey using DGPS,Open Close three wired leveling and Structure inventory and survey for Koderma-Kolkata |
1 Month |
2021-2022 |
MATRIX GEO SOUTIONS PVT LTD |
233 |
Four Lanning of Madathukulam - PoIlachi section of- NH-209 (new NH-83) from Design Km 74.380 to Km. 116.950 (Total Design Length = 50.078) under Bharatmala Pariyojna Phase — I under the category of residual Works of NHDP on HAM in the State of Tamil Nadu |
7 Days |
2021-2022 |
DP Jain |
234 |
Topographical Survey OF NH-29 Design CH80+930 to 96+400 in the state of Assam |
1 Month |
2021-2022 |
S P infra Projects |
235 |
Topographical Surveys for 4 laning of Garmukteswar to Meerut highway in the state of Uttar Pradesh |
1 Month |
2021-2022 |
SAMARTH INFRAENGG Technocrafts Pvt Ltd |
236 |
Topographical Survey for Development of Six Lane Jakkuva -Korlam Section of NH-130-CD road from KM 396+ 800 to KM 421+100 under Raipur-Visakhapatnam Economics Corridor in the state of Andhra Pradesh on Hybrid Annuity Mode. |
1 Month |
2021-2022 |
NKC Projects Pvt. |
237 |
Topographical Survey for Six Lane Odisha/Andhra Border-Jakkuva Section of NH-130 -CD road from KM 365+033 to KM 396+800 under Raipur-Visakhapatnam Economics Corridor in the State of Andhra Pradesh on Hybrid Annuity Mode |
1 Month |
2021-2022 |
Aartav Engineering |
238 |
Construction Eight lane Talasari –Kim Expressway from Km 154.600 to Km
190.000 (Jujuwa to Gandeva Section of Vadodara Mumbai Expressway) in the State of Gujarat on Hybrid Annuity Mode under Bharatmala Pariyojana(Phase I-Package VIII) (Total Length= 35.4km). |
1 Month |
2021-2022 |
AEROTIDE Infrastructure Engineering Pvt Ltd |
239 |
Topographical surveys for “Six Laning of Karal- Kantakapalle section of NH-130CD from Km. 421+100 to 445+100 in the state of Andhra Pradesh”. |
1 Month |
2021-2022 |
SAMARTH INFRAENGG Technocrafts Pvt Ltd |
240 |
DETAILED DESIGN OF FOUR LANING OF EXISTING 2-LANING STRETCH FROM DHARMAPURI AT KM 117.000 TO LONAND AT KM 166.400 (PKG-4) ON MOHOL-ALANDI SECTION (DESIGN LENGTH 49.400 KM) OF NH-965 IN THE STATE OF MAHARASHTRA ON EPC MODE |
1 Month |
2021-2022 |
AEROTIDE Infrastructure Engineering Pvt Ltd |
241 |
Topographical Survey For the project Construction of 6-Lane access Controlled greenfield highway from KM 180+000 to KM 2017+100 of Deogarh (Near Dhandhaniya ) to Rajashthan /Gujarat border section of NH-754K as a part of Amritsar -Jamnagar economic corrider in the state of Rajasthan under Bhartmala Pariyojna |
1 Month |
2021-2022 |
MKC Infrastucture Ltd. |
242 |
Ground Control Survey using DGPS, RTK & Levelling using Auto level at Saraigarh and Lalitgram in the state of Bihar |
1 Month |
2021-2022 |
MATRIX GEO SOUTIONS PVT LTD |
243 |
Topographical Survey of Siddipet ORR Road in the District of Siddipet in the State of Telangana |
30 Days |
2021-2022 |
SHELADIA ASSOCIATES, INC. |
244 |
Six Laning & Strengthening of KM 403+400 of Hubli-Haveri Section of Nh-48 (old NH-04) in the state of Karataka (total Length-63.4 KMs) |
45 Days |
2021-2022 |
Sekura Rodas Limited |
245 |
Rehabilitation and upgradation by Four Laning of Singhara to Bijhabahal Section From KM 311+000 to KM 414+00 (Design Chainage From Km 310+806 to KM 414+982 ) of Nh-06 (New Bh-49) in the State of Odisha (total Length-104.18 KMs) |
45 Days |
2021-2022 |
Sekura Rodas Limited |
246 |
Construction Eight lane Talasari –Kim Expressway from Km 154.600 to Km 190.000 (Jujuwa to Gandeva Section of Vadodara Mumbai Expressway) in the State of Gujarat on Hybrid Annuity Mode under Bharatmala Pariyojana(Phase I-Package VIII) (Total Length= 35.4km |
30 Days |
2021-2022 |
AEROTIDE Infrastructure Engineering Pvt Ltd |
247 |
Topographical Survey For Six Laning of Ramanattukara Junction to start of Valanchery bypass section of NH-66 from Design Ch. 258.818(Ex.Km 27.840 of Kozhikode bypass) to Design Chainage 298.500(Ex.Km 304.250) in the state of Kerala on HAM under Bharatmala Pariyojana. |
30 Days |
2021-2022 |
KNR Constructions Pvt.Ltd |
248 |
Field Work & Ground control survey along with additional structure inventories using traditional technologies i.e. Electronic Total Station (ETS), Differential Global Positioning System (DGPS), Real Time Kinetic (RTK) and other important and relevant instruments for Punjab Bharatmala Project – Jagadri to Ponta Sahib (16.5 km in length), Yamuna Nagar to Bilaspur (15.5 km) in the state of Punjab & Haryana |
30 Dyas |
2021-2022 |
MATRIX GEO SOUTIONS PVT LTD |
249 |
Field work & ground control survey along with additional structure inventories using traditional technologies i.e. Electronic Total Station (ETS), Differential Global Positioning System (DGPS), Real Time Kinetic (RTK), Auto Levelling and other important & relevant instruments for Boregaon Buzurg
- Muktainagar Section (78 Km) in state of Madhya Pradesh & Maharashtra. |
30 Days |
2021-2022 |
MATRIX GEO SOUTIONS PVT LTD |
250 |
Field Work & Ground control survey using traditional technologies i.e. Electronic Total Station (ETS), Differential Global Positioning System (DGPS), Real Time Kinetic (RTK), Auto Levelling and other Important & relevant instruments for Kundli – Ghaziabad – Palwal (Eastern Peripheral Expressway) 135 KM in the State of Uttar Pradesh. |
7 Days |
2021-2022 |
MATRIX GEO SOUTIONS PVT LTD |
251 |
Topo Topographical survey of Phaltan existing road (work extension in Dharmapuri
To Lonand ) from km 131+875 to 139+360 in the State of Maharashtra |
30 Days |
2021-2022 |
AEROTIDE Infrastructure Engineering Pvt Ltd |
252 |
Design and construction of 300m span major PMT Akpa Bridge with balance cantilever (PSC) supre structure abutments on open foundations and piers on well foundation over Satluj river at Km 384.650 on road Hindustan -Tibet (NH-22) under project deeepak inh Himchal Pradesh |
7 Days |
2021-2022 |
S.P Singla Construction Pvt. Ltd |
253 |
Consultancy Services for Preparation of Detailed Project Report for “Junction at Hyderabad ORR (Interchange at
Gowrelly) – Valigonda – Thorrur – Nellikuduru - Mahabubabad –Yellandu – Kothagodem Junction at NH-30 in Principle approved
National Highways in the State of Telangana. |
30 Days |
2021-2022 |
SHELADIA ASSOCIATES, INC. |
254 |
Topographical surveys for “6 Laning of National Corridor NH-19 from Panagarh to Palsit from Km. 521.120 to Km. 588.870 (Total Length 67.750 Km.) in the state of West Bengal under Bharatmala Pariyojna to be executed on BOT (Toll) basis |
60 Days |
2021-2022 |
SAMARTH INFRAENGG Technocrafts Pvt Ltd |
255 |
Topographical Survey for 1134_Karala-Kanjhawala Road Pkg. – 1 in Delhi. |
10 Days |
2021-2022 |
H.G. Infra Engineering Limited |
256 |
Transfer of GTS Level by fly Levelling of GTS Connection from Jejuri Railway Station to the NH–965 Project Location, Dharmapuri To Lonand in the State of
Maharashtra |
30 Days |
2021-2022 |
AEROTIDE Infrastructure Engineering Pvt Ltd |
257 |
Topographical Survey of the proposed flyover at Sabedarganj in Prayagraj in the State of Uttar Pradesh |
10 Dyas |
2021-2022 |
Arvind Technocrats & Engineers LLP |
258 |
Topographical Survey Of ROB falling on NH-44 in Samba city in the State Territory J&K |
15 Days |
2021-2022 |
SP Infra Project |
259 |
Topographical Survey For Rehabilitation & Upgradation of Jalgaon-Bhadgaon-Chalisgaon-Nandgaon-Manmad road NH-753J to Two Lane With paved shoulder configuration in Nandgaon to Manmad (Km147/425 Km to 168/800-Length 21.375 km ) Section of NH-753J in the State of Maharashtra on EPC mode |
30 Days |
2021-2022 |
Rajendra Singh Bhambhoo Infra Pvt Ltd |
260 |
Upgradation and Four Laning of Haridwar Bypass Package-1 From Km. 0+000 (Km 188+100 of NH-58) to Km. 15+100 (Km 5+100 of NH 74) in the state of Uttarakhand on Hybrid Annuity.
And Development of 6-lane access controlled Spur to Haridwar from Delhi-Saharanpur-Dehradun Economic Corridor in the state of Uttar Pradesh and Uttarakhand on Hybrid Annuity Mode under Bharatmala Pariyojana (From Ch. 0+000 to Ch. 50+700) |
30 Days |
2021-2022 |
Ashoka Buildcon Limited |
261 |
Topographical Survey Six Laning of National Corridor NH-19 from Palsit to Dankuni (up to NH-6 connector) from Km 588.870 to Km 652.700 in the State of West Bangal |
45 Days |
2021-2022 |
Consulting Engineers Group Ltd. |
262 |
Topographical Survey for road profile at Nhavra to Adhalgaon |
30 Days |
2021-2022 |
Rajendra Singh Bhambhoo Infra Pvt Ltd |
263 |
Topographical Survey for Construction of four lane Greenfield Delhi-Amritsar-Katra Expressway from junction with Jind-Karnal road (NH-709A) near Alewa village to junction with Ambala-Kaithal-Hissar road (NH-152)near Kharak Pandwa village (KM 91 +400 to KM 120 +250) on Hybrid Annuity Mode under Bharatmala Pariyojna in the state of Haryana.PKG-4 |
30 Days |
2021-2022 |
NKC Projects Pvt. |
264 |
Topographical Survey of the highway near Ghata village Gurugram |
7 Days |
2021-2022 |
BTES Consulting Services Private Limited |
265 |
Ground Control Survey using DGPS RTK and Levlling using at Khaliabad - Bansi Green Field Section ( New Alignment approx -54.5 Km) |
45 Days |
2021-2022 |
MATRIX GEO SOUTIONS PVT LTD |
266 |
Master Planing and program management consultants service for redovelpment of AIIMS Campus Delhi |
10 Days |
2021-2022 |
AECOM India Private Ltd. |
267 |
Traversing ,Cross Section ,TBM Pillar & PCL Marking for the reconstruction and strenthening of Deverpalli to Jeeluumilli (NH-516D) from KM 20.500 to 29.630 and from 33.130 to 56. 23 (pkg-2) in the state of Andhra Pradesh on EPC Basic |
30Days |
2021-2022 |
Vriddhi Infratech India Private Ltd |
268 |
Consultancy Services for Detailed Engineering Design and Approval from Authority Engineer for “Construction & Up-gradation to 2-Lane with paved shoulder from Km 80+675 (Start of Kishtwar Bypass) to Km 95+550 (End of Helmet Top) of length 14.875 Km including Link Road from Km 0+000 to Km 1+871 of Length (1+871) Total Length = 16+746 Km on Khellani – Kishtwar –Chattroo - Khanabal Section of NH- 244 in the Union Territory of Jammu and Kashmir on EPC Mode (Pack-IV). |
30 Dyas |
2021-2022 |
AECOM India Private Ltd. |
269 |
Construction of Four lane raod from Siddipet to Ellanthakunta road from KM 22/0 to 32/0 in Rajanna Sircilla District |
15 Dyas |
2021-2022 |
SHELADIA ASSOCIATES, INC. |
270 |
Four lane project highway comprises of the section of National Highway No 347BG from Balwara (Design Chainage 42.260/ Existing Chainage 45.000) and end Dhangoan (Design Chainage 82.660/Existing Chainage 86.00) (Design Length = 40.40 Km) in the State of Madhya Pradesh.
|
30 Days |
2021-2022 |
AEROTIDE Infrastructure Engineering Pvt Ltd |
271 |
Construcation of Balance work and value addition works of Four Laning part of Ramban to Banihal Section of NH-1A (Now NH-44 ) ,From KM 151.00 to KM 187.00 on EPC mode in the Union Territory of Jammu and Kashmir under NHDP Phase II |
30 Days |
2021-2022 |
RUKY Projects Private Limited |
272 |
Construction of 4 Lane Elevated highway and at grade improvements at Gopalganj town from Design CH: 386+410 (Existing Ch: 384+000 ) to Design Ch: 386+750 (Existing Ch : 386+410 ) on NH 28 , Length 2.75 KM in the State of Bihar |
15 Days |
2021-2022 |
ASC INFRATECH PVT LTD |
273 |
Construction of Six-Lane Access Controlled Greenfield Highway section of NH-150C from Julekal
Village(Design Km 242.200) to Kurnool town terminating on NH-40 (Design Km 280.400)(Design Length=38.2Km) as
part of Solapur-Kurnool-Chennai Economic Corridor on HAM under Bharatmala Pariyojna in the state of Telangana
(Package-II). |
30 Days |
2021-2022 |
Ashoka Bulidcon Limited |
274 |
Construction of Four Laning of NH-71 from Madanapalle (Design Km 0.000/Existing Km 0.000 of NH-71) to
Pileru (Design Km 55.900/Existing Km 59.250 of NH-71) (Design Length = 55.900 Km) on HAM Mode in the State of
Andhra Pradesh under Bharatmala Pariyojna. |
30 Days |
2021-2022 |
Ashoka Bulidcon Limited |
275 |
Survey Work at tunnels at " Four Laning of Ramban to Banihal Section of Nh-44 from KM 151.00 to KM 187.00 on EPC mode in the State of Jammu and Kashmir under NHDP Phase II thorugh on EPC Contarct |
30 Days |
2021-2022 |
Rodic Consultants Pvt Ltd |